Bids for the project known as the Hominy Creek-Amboy Road Corridor Connector will be received Jan. 20 by the city of Asheville. The project includes the installation of 6,500 linear feet of a 10-foot wide asphalt greenway, including concrete sidewalk, curb, gutter, storm drains, signs and more, according to a public notice.